Monday, April 22, 2013

Monday - already?????

Egads - it is Monday already!!!!  Feels like I should have had another couple of weekend days in there somewhere!

Regardless - no matter how much I've tried to slow things down - the calendar (and time) does march on!  Geesh!

On the schedule for today's Superwoman (hahaahaaaa!!!!):

BTW -  you can see how much I DIDN'T get done last week!!!!  Spent too much time in the garden!


HOUSE (15 minutes at a time!)  4 x 15.
Sampler blocks I need to work on
  • Zone 1 - Side porch - DECLUTTER 
  • DONE Zone 2 - Kitchen - general
  • DONE Zone 2 - Kitchen - the REFRIGERATOR  (SCARY!!!!!)
  • DONE Zone 2 - Kitchen - the SHELVES!!!!!! - top 2
  • DONE Zone 2 - Kitchen - Ceilings, walls, countertops, faucets, trashcan
  • DONE Zone 2 - Stove top
  • Zone 2 - Kitchen floor again
  • WHB again!!!!
    • DONE Dust
    • DONE Dust Mop
    • Scrub floors 
    • DONE Sort Magazines/etc.
    • DONE Trash and trashcans
    • Do Tuesday Fresh sheets
    • Front and side porch doors and mirrors
GARDEN (15 minutes at a time!) 4 x 15 (I spent entirely too long outside yesterday!)
Back to Square One Mystery BOM -
Needs April "doin's"
  • DONE Weed Strawberries and clean up bed
  • Work on Raspberry patch - tame the blasted thing! and put on wires!
  • Harvest whatever is in last year's cabbage beds!  this is still good to eat!
  • Prepare new beds for planting (onions, sweet potatoes, peas) 
  • DONE IF possible - set up manure and mulch around fruit trees and bushes
STUDIES (15 minutes at a time!)  This will be a "Jump in where I am!"  No catchups allowed - UNTIL Sunday - which is alloted for that! ON HOLD FOR THIS WEEK


QUILT


Baby Quilt one - may or may not add borders.
Needs backing and quilting and binding - walking foot!
  • 1 Hexie a day (NO catchups)
  • Back to Square One - the April block
  • Walking Foot Sampler - pink sampler
  • WF - work on Baby Quilt #1 - FINISH to binding!
  • FMQ practice - Mark into quadrants.  Practice loops.
  • If I get a chance - work on Sampler swap stuff and FINISH - I want to send THIS!!!!
Baby Quilt #2 -
Needs the rest of this walking foot quilted - including border, binding
MENU
DONE B: Oatmeal
DONE L: Homemade vegetable soup
DONE Yum! D: Stir Fry (soy tofu????) with leafy greens, coles, 



No comments:

Followers