Monday, December 10, 2012

Design Wall for week 49 - 12-10-12

As I said in my stash report - last week was the week that was!

Oh yeah - notice the NEW buttons on the right side of the blog. One is 31 days of Walking Foot Quilting! PLUS on the pages - for Friday there has been a slight change. Not only is Friday "finish it friday" (courtesy of another blog) but it is also quilting day! At least! Hopefully this may at the least keep my flimsy pile from increasing to a towering pile! And may actually get some moving on to the NEXT step (which will be binding - and which I REALLY hate to do!) There is also (hopefully it is still there) a list of 31 steps hopefully completed - and on my quilting sampler! Which is another new thing. ANOTHER quilting sampler! for the walking foot!

Another new button (button seems to have vanished!) is for Bonnie Hunter's Mystery quilt - Easy Street. I'll show this one in a bit! Why another beginning quilt? Well, what do you do when you're down in the dumps, sad, maybe a bit (and more) overwhelmed with all the projects you have? Why - start another new quilt, of course!

That being said - on the agenda for this week's stitching....................


APPLIQUE AND HAND STITCHING

Thanksgiving Hexies - needs work.  I took it with me to son and dil's house on Saturday - but forgot needle and thread!!!!!

This HAS had Stitch in Ditch - and I have NO idea where I hid the photo.  Still needs applique
 MACHINE QUILTING
Walking Foot
For the new sampler - 31 days

Old walking foot sampler - still has a few "undecorated" squares


Fancy Flower Placemats needs walking foot - A LOT of it!
 PIECING
Charm Around


Christmas Ribbons - a 2011 WIP

The NEW quilt project - EASY STREET by Bonnie Hunter
Needs Black on White - a LOT of it - and what you see is ALL the black on white I have!
Sadly, this means a trip to the quilt shop!  (heeeheheheeeee!)

Twister - I would really like to get this one done - not that far really!

SEWING
And I have this STILL to do - I do want to work on it - honest!!!!!

Stash Report - and a bit more - for Week 49 - 12-09-12


This has been a week and a half - and then some! 

I DID get the triangles done.  I also re-learned how to stitch a square in a square - necessitating re-learning how to use the seam ripper!  Drat it!

And with all this - one of my favorite kitties - the lovely tortoise shell one - kept getting sicker and sicker and had stopped eating again.   No matter the enticement (soft kitty food with her favorite flavors, fed to her separately from the other kitties who tend to be gluttons!), she kept losing weight and no longer ate.  I took her to the vet where she was diagnosed with cancer of the liver in pretty advanced stages.  I had her put to sleep - and cried (and still do cry) buckets over her.  She was so sweet and up until I adopted her had really been pushed aside in favor of her sister.  Sasha was only 4.5 years old.  A very young kitty for her diagnosis.

since then, honestly, I haven't felt like quilting now that I don't have my little shadow following me around.  However I most certainly wouldn't wish for her to be suffering the pain that I know she must have suffered and of which I was unaware.

That said, life goes on.  I miss her and loved her dearly just like I love all my other 4 kitties.

49 12-09-12 Used This Week: 2.625 yards/Used This Month: 2.625 yards for December/Used Year to Date: 115.695 + 2.625 = 118.320 yards
Added This Week: 0 yards/Added This Month: 0 yards for November/Added Year to Date: 51.98 yards
Net Used for 2012: 66.340 yards

Monday, December 03, 2012

I'm calling it DONE (at least as a flimsy!)

The Hurricane Sandy blocks will become my new table topper - and MUST be replaced by one of my flimsies I've already got ready to quilt.  Reason mostly has to do with being indecisive about borders and border colors.  And some lingering feelings about this quilt.  So - I'll substitute with one that is already twin sized!  Get that quilted this month and off it will go!  Probably to one of our local hospitals - more on the where later!

Monday - the sequel to Sunday (which was the sequel to Saturday, etc.)

New week! 

Today, especially after yesterday resting all day (has to do with the "characters" upstairs who partied LOUDLY until 420 AM and one of whom proceeded to beat something to death that he broke - no matter that whatever it was was NOT going to be fixed by him pounding at it!!!!!  at 420 AM!  Ugh!)

At any rate - new day - I posted my design wall for the week - my "hope to do it" list.  Today I NEED (desperately) to spend some time on HOUSEWORK, PAPERWORK, LEAF RAKING (which is also exercise), building my gardens for next spring,  writing ONE PAGE for the workshop (and typing up what I had written thus far to send to my dd in Canada), and QUILTING - sewing the December triangles, getting the Twister quilt ready to be whacked tomorrow, and doing SOMETHING on last month's Charm Around quilt.  And if that works and you believe that then I want to sell you a bridge I know about!!!!!
..................................................
Chores done include dusting the bathroom ceiling, walls and air vent, scrubbing the bathroom sink, folding the last of today's laundry and putting that away. 

I also got the first set of the December triangles done and have the second completely ready to go.

Next I think I will put in a few minutes outside exercise (15 minutes a day this week) - hauling the leaves back to my garden - not dumping them on the garden beds YET. (tomorrow?), playing with the hat for another 15 minutes worth of chores, then 45 minutes of sewing the rest of the triangles (and listening to audio book - Walk across the Sun - which is extremely heart rending)
..................................................
Did my 15 minutes of leaf raking (and my back is telling me all about it!)  Also emptied DW and heated up some turkey stew (turkey broth and casserole mixed together - doing this one AGAIN!  YUM!).  Going to work on menues for the week.  Menues are hopefully based on what I have on hand!
..................................................

Design Wall for Week 48 - 12-03-12

Yup, it's Monday Again!!!!  (Sooooo fast???!?)

While I did finish the table topper - I still haven't made a decision re borders or not on the Hurricane Sandy - and may substitute another quilt for the charity quilt that I had intended this one.  If so, then I don't think I will put on borders, but declare it a table topper!  Still thinking!

While I did make major inroads on the Charm Around, it obviously isn't done - plus I really WANT this one to have black sashing and borders - and black I have a very limited (too limited) a supply!  Even scrappy blacks!  So this will probably have to wait until I have some $$$ and can venture into the quilt shop again - probably when I take my triangles!

That being said - here's this week's line-up......

December Triangle fabrics


Hexies - needs fixing and placemats and napkins
Threadhead Mini Sampler - I want to applique on the large green rectangles  - have a couple of ideas in mind!

Walking foot Sampler - I'm WAY behind! 

Also there is a FMQ foot sampler - no picture as of yet!  Barely started!

Charm Around - needs the rest of the squares and all trimmed, sashed, put in rows and joined together then borders put around the whole thing.  I need black fabric for sashing and borders

Twister - I SHOULD finish this this week - hopefully!

Finish up the slacks, make (or work on) the skirt.  If possible - cut out the jacket (doubtful there will be time this week)

Sunday, December 02, 2012

Stash Report for Week 48 - 12-02-12

This week saw my LE - aka Lilac table topper (even if it doesn't have any lilacs in it!!) completed.  It should have also had my Hurricane Sandy completed - BUT it needs borders if it is to become a quilt - and possibly another row of cabins as well.  I may put a note on my stash report page so I don't forget exactly how much I've used so far re the logs - but that is like begging for another WIP!!!!  why no borders yet?  It has to do with that lovely blue (and/or green) line.  Have to think on this!

48 12-02-12

Used This Week: 1.375
Used This Month: 1.750 yards for November, 0 yards for December
Used Year to Date: 114.320 + 1.375 = 115.695 yards
Added This Week: 0 yards
Added This Month: 3.5 yards for November
Added Year to Date: 51.98 yards
Net Used for 2012: 63.715 yards


And if I want to break 100 yards net - I had best get my rear in gear and QUILT QUILT QUILT!!!!  Goodness knows I have the flimsies to do it!  I may not get there but I sure should be a heck of a lot closer!

Friday, November 30, 2012

December Projects, UFOs and an uh-oh!

As usual I set up a picture file of projects I would LIKE to work on on my computer.  I think if I were a Magician with a high degree of whatever it takes that I might get the job done!  But I'm not!!!!

Judy L. has set up some new requirements for her next year's UFOs (which should be GREAT! - if only I could prioritize!)  Actually this may HELP me to prioritize - either that or I'm going to head down the tubes FAST!!!!! 

Of the 24 projects done the last 2 years - MOST have significant progress made - and I have 19 finishes - at least as far as flimsies - which is most certainly 19 more than I had BEFORE I started on the UFO projects!  (even if 2 were classwork!)

Right now I have a tentative list of projects to work on for next year - made up of items from THIS year and LAST.

Every month I'd like to
1) swap triangles - so that is a given.
2) I also want to do at least one machine quilt - whether with the walking foot or with the FMQ foot
3) I would LIKE to have at least ONE quilt for handwork - whether applique or hand quilting - or my beloved Hexies! (probably hexies!) - something to do in front of the DVD player
4) I would like to also participate in at least one class (well, 3 if I join the Open Sew twice a month! plus the monthly group quilting project - we're doing table runners this next year)
5) I want to work on at least one of the projects that are current WIPs!  No guarantee that I will finish it - just work on it
6) I REALLY need to do some serious sewing for my wardrobe - which is really beginning to show the effects of being worn to death!  Besides I'm tired of a lot of stuff I own!
7) I want to also work on the new project that Vicki does (this year - the color challenge, next year - ???)
8) In addition to all this I want my house to be gorgeous and to achieve world peace - not necessarily in that order!

So there ya have it - the big Uh Oh - I'm in troubbbbbbblllllle now!!!!
...................................
That being said - December project list........

1) December triangle swap

2) Finish up the applique/quilt on the Threadhead mini sampler (needs applique and quilting on the green!)

3) Hexies - finish Thanksgiving sampler for Lynn. Begin one for Wendy?

4). Practice FMQ sampler

 5) Nicole's Couch Quilt - this is for my son and daughter in law - I want to get it quilted!

 6) Class - Twister - last session this year

7) UFO - Springin' All Over - but....


I would REALLY rather work on the Underground RR and finish that one up (need only sashing, borders - and the flimsy will be done!!!)

 or better yet - Twisted Ribbons which is seasonal!

and save the Christmas sampler for next year? When I feel more capable of applique!
8) and it would be nice to work on some other 'almosts' - BUT I'm not counting on it!

Wednesday, November 28, 2012

Flimsy Finish!!!! (Yay! It's a Table Topper!)


And now - it's WEDNESDAY - and it really is!

On the schedule for today - I have a writer's class - and - uh - I haven't written a thing!  Mind you, I am supposed to make a serious commitment to writing if I am taking this class - plus I agreed to write at least one page every morning.  The last class I went to was on October 31 - and it is now November 28.  Mind you, that is a serious number of pages - 29 to be exact!  And how many have I written?  Let's just say - time to change the subject!

Fortunately though I do seem to not have a lot of difficulty with writing - although I definitely remember times when writing was really HARD! 

BUT add to this - I have an assignment - and that one IS harder!  I have to describe HOW I planned an action!  And considering that at the time I was between 3 and 5 years old and now I'm - uh, let's skip that part - just let it be said that I'm definitely older than 3 and 5 years old now!  Anyway - as best as I remember, I didn't really plan.  It just sort of happened.  Sort of.  And, of course, that type of thinking probably was what gave my mother the worst of her headaches!

At any rate - that's what I will be doing this morning - for a while at least!  That and finishing up the last seam on an item and taking pictures and posting them.  (hmmm - I wonder if blog posting counts as being serious with my writing?  At least a page a day?????  Hmmmm!)
.....................................................
This is later in the day (704 PM and I'm more than ready to put my feet up!)

I finished one of my core stories for class today - length - 4 legal size pages - handwritten.  I read that as well as my writing "prompt" assignment in class - not a lot was said except for how descriptive that was and that it was "fine"!  I had quite a bit of problem reading it too - especially since I had a hard time reading my handwriting!  Next time everything gets typed and printed!

I also finished up the main part of the Hurricane Sandy - debating on borders.  If this is to be a charity quilt (it's supposed to be) then I need to add more to it, add borders and so on - to make it a twin size.  If it is to be a table topper (I do like it) - then it's fine the way it is! 



But then I said it was to be a charity quilt.  So maybe another row or 2 of the logs and then 3 borders - one light - about 1.5 in finished, another .5 inches finished and the outside and last one maybe 3 inches finished - which should add 10 inches to the quilt (5 inches each side)

And, yes, the blue horizontal stripe across each row of blocks IS intended - and yes, the ONE green horizontal stripe (on the end) is also intended - sort of an "on purpose" 'mistake'!

After I finished that - and before the borders, I picked up the mail and my movies for the night - and fixed supper (turkey casserole - sort of a turkeyetti with fat noodles), then packaged up the soup (7 quarts broth) for the freezer as well as Ziploc bags - each with 12 ounces turkey in them - and marked for Ravioli, Tamales, Fajitas, Enchiladas - and of course, one for some of the leftover turkeyetti - which I already know I will have a problem finding a place to store!  Everything else is packed away = and my freezer is SOLID!

With luck - tomorrow I'm baking or boiling and pureeing the pumpkins - then drying that in my food dryer sort of like apple butter.  That's with luck!

At this point I am SERIOUSLY thinking of getting a canner - and I positively lust after the All American Pressure Canner!  Costs like sin - but oh my is it a truly lovely canner!

It's Tuesday! (but it's really Wednesday!!!!)

As of yesterday evening (sorry about not posting the pix yet - I will - still!), I STILL haven't finished the log cabin quilt - and was tired enough I was getting REALLY STUPID!  Like I couldn't figure out WHY one side of one particular block (there's ALWAYS one!) was shorter than the other side when all the strips were (or should have been) the same width!  Will work on that one today!

The lilac one is done - BUT I still haven't taken pictures yet.  I will though!  Only NOW (of course!) I'm not really sure I like the 9 patch next to the whatever it was that I created!  But it will do nicely! 

So, I decided to do the only logical thing!  I started work again on my UFO - Charm Around.  Keeping in mind that the only commitment here is not necessarily to finish it but to do a significant amount of work on it!  And then, I decided to figure out exactly how many squares I really need!  The original pattern used charms of 5" square (all cotton,  mind you!) and then to stitch triangles made from 4" squares cut diagonally to each of the charm sides.  Which would have been fine - IF the folks sending the swap had really used 5" squares for their charms!  And had used all cotton ONLY!  Instead, I suspect that some of the folks were newbies to quilting - and the "charms" were for the most part 4.5" square - or mostly square with some interesting shapes thrown in.  that plus the fabrics used cotton, polyester blends, some sort of heavy fabric and all varied in terms of weight, thread density and so on.  Nevertheless, I'm putting all of these into the quilt - they came from dear friends with whom I shared many joys, trials, and tears and I miss them all!

Regardless - I'm supposed to have 120 Square in a square (name of the individual block) for this quilt.  BUT because I've had to adjust for sizes and all - it will now be 170 of these blocks!

Next question - how many have I done????  (OK - good question - next question?)
  Needless to say - this one will be "a goodly progress this month"!!!!  And probably evolve into my next LE project!

Tuesday, November 27, 2012

By Monday Evening... (alright - so it's Tuesday, now!)

By Monday evening - I had the lilac table topper quilt (no lilacs - just roses and forget me nots and lovely purple blender fabric) almost ready to be sewn into rows and to figure out whether or not I'm going to put on borders. 

Also my Hurricane Sandy Quilt is ready to be sewn into strips and put together along with borders (3????)

Today that is exactly what I'm working on!  (instead of working on my writing which is what I'm SUPPOSED to be doing for at least an hour a day!)  AND I'm on the phone with my friend Peggy chatting about whatever is going on in our worlds!

Monday, November 26, 2012

Design Wall for Week 47

Well, after a week of sorta, couldn't, wouldn't, and shouldn't and probably gaining ANOTHER 5 pounds in the process (at least!), it is once again design wall Monday.

Leader Ender project
I still have to sew the rows together into single 12.5 inch unfinished blocks but I have 5 of these - and with alternating blocks it should make a lovely table topper!

Alternate these with a 9 patch??  I'm leaning towards this - maybe, maybe not?
 Machine quilting - Walking Foot
Fancy Flowers placemats - for a friend

Baby Quilt #3 - finish and hope

Baby Quilt Number 1 - Walking foot - I'm thinking mostly of crisscross lines?

Walking Foot Sampler - was SUPPOSED to be done - but then a lot of supposed to be things didn't happen
 Piecing
Hurricane Sandy Log Cabin quilt blocks - NO ONE contacted me re sending these - so I'm finishing this up as a small quiltlet and donating for charity

Twister quilt - still needs slicing and dicing - and the 1 row fixed so it matches where it is supposed to.  Needless to say - I didn't make it to class yesterday.

Charm Around - this is my November UFO  Obviously not worked on.

Quilting Sampler blocks - uhm - this will probably go into December's list
 Sewing
Fall pattern - I STILL haven't finished up this pattern - and on the 21st of Dec we start WINTER which I haven't even gotten to!

Sunday, November 25, 2012

Stash Report for Week 47 (aka Every little bit counts!)


47  Courtesy of the centerpiece placemat that didn't quite make it to Lynn and Nathan's table this month I did use some fabric.  Although not a lot of much!

Mostly I worked on Hurricane Sandy and other projects and rushed here and there doing who knows what (because I sure as heck don't know!)

Used This Week: 3/8 yards =0.375
Used This Month: 0.375 yards for November
Used Year to Date: 113.945 + .375= 114.320yards
Added This Week: 0 yards
Added This Month: 3.5 yards for November
Added Year to Date: 51.98 yards
Net Used for 2012: 62.340yards


(and yes, I would LOVE to break 100 yards on the net used for 2012!!!)
 

Flimsy finish - Sorta!

The sorta means that I will probably need to repair some places where my hexies aren't quite hanging together!  However.... 

This (when it is eventually finished - and has a backing on it) is for my daughter in law.  I had hoped to have it done (including backing PLUS quilting) by Thanksgiving - actually before then! However that didn't happen!  So - she'll have it - plus placemats in time for next year!


Fabric used for Hexies - according to my All-in-One Quilter's Reference tool - I used a little more than 1/4 yard.  However I KNOW I used more than that!  If only because I wasted a heck of a lot by cutting my squares entirely too large!  so - maybe 3/8 yard is what I figure (19 hexies is more than 1/4 yard and less than a half yard.)  The beige fabric is what I MIGHT (or not) use for backing on this.  Provided, of course, that I figure out HOW to attach the backing!

Tuesday, November 20, 2012

One would think...........

One would think that since THURSDAY is Thanksgiving that I would be completely ready for that holiday!  Hahahaha!!!!!  

At least that was the way it was earlier today!

I decided at about 10 AM that I REALLY needed to deliver my HSTs to the quilt shop today - and so - having little sense, less money, a nearly full tank of gas - away I went!  Complete with HSTs, and a gazillion or so questions - all about the projects I'm currently working on!  (Hexies, Hurricane Sandy, and Twister).

 
Re the Hexies (aka Thanksgiving project - this is only PART of it mind you - the rest may have to wait a bit!) -
1) I wanted to know HOW to remove that LAST row of paper templates and yet keep the shape while putting the backing on!  Want to finish this part up today for sure!  So the answer IS critical.  Reply?  use the IRON - duh! Hope it turns out as cute as I think it might!  And I will love getting the placemats ready as well to go with! (common backing for ALL - but different colors on the front - maybe with/without the big bird!)
2) What the usual size of placemat is - espec. since I will be "winging it" and making BIG hexagons for the placemats!  Would LOVE for them all to be the pomegranite one - but I don't think I have enough!  May have to do something with that!
 
 
 
Re the Twister - I wanted to know....
1) how important it really is to have those squares EXACTLY meet each other!  I was HOPING I would hear - not really that important.  Well, that was a wasted question?  And a rather dumb one on my part (Duh #2!)  Of COURSE it is important - esp if you have to re-cut with the Twister template - and the seam joins are what you use for aligning your fabric!  Duh!
 
2) Yes, class WILL be this coming Sunday!


 
 
Maureen wasn't there so I couldn't ask her re the Hurricane Sandy question - but am finishing these things up anyway.  If I can't find some way for these to be used for this project, I will set them up in a quilt by themselves for the next Charity quilt.
 
 
Anyway - I DID buy the tacky stuff for applique which will be used on several projects - probably in December.  I also bought some of "Granny's Spot Remover" - guaranteed to remove spots like you wouldn't believe.  Hopefully!
 
Having done that I journeyed to my favorite meat market (definitely my favorite - even though I only go there 1- 2 times a year!) - and got chicken and more chicken.  The price was RIGHT! - including for leg quarters as well as chicken breasts (10 pound amounts).
 
By now (you can see this coming, can't you!) I was in a thorough buying mood (mind you, I ONLY have a refrigerator freezer!) - and went grocery shopping at Price Rite!  I usually buy at a different grocery - one that is a LOT closer to me and which has some pretty good sales.  But this time I decided to drive an extra 5 minutes and go to Price Rite - where I found a REALLY nice buy on turkey.  Fortunately (for my freezer) I only got one - would REALLY like to get more!  Still - am trying to get ahold of my son (who has an extra freezer) and see what he says!
 
Sum total - my meat supply for much of the winter is now done!  Except for beef and maybe lamb (IF I can find a good buy!)  And I'm thinking seriously of getting a pressure canner - would LOVE the All-American one.  Sigh!
 
Vegetables - I picked up what I felt was a good buy - will cook and freeze or dry as I go on this.  I bought in Collards, Kale, broccoli (mine is GONE).  Would love to have a p-canner for this too!  But will either freeze or dehydrate what is more than a meal's worth.  Probably dehydrate.
 

got home - and checked the time - and found I had shot most of another day!  : (  Oh well, there IS this evening and there IS tomorrow!

But really, one WOULD think that I would have been a bit more ready for T'sgiving, wouldn't one?

Monday, November 19, 2012

It's Monday, Isn't It!!!

Forgot to post my Mon project list -

CLEANING/DECLUTTERING
FINALLY I got to the small white chest that holds all the patterns that I've ever bought - uh - or bought since 19--whatever it was when everything stored in my parent's basement FLOODED and turned to nasty paste!
 
 
I tossed all the can't stand 'ems, binned for re-homing all the kid stuff (by the time I finally adopt kids - this stuff will be well outmoded!). Unfortunately I didn't re-home all the patterns that are one size below me (on the top - not saying how much smaller on my lower half - state secret, that one!) 

 
 

I set up several pages (one per pattern grouping number) with pattern number, sizes of pattern, and check lists of what kinds of items I will have. I figure that if I want to make a blouse it will be easy enough to check out what patterns have blouses in them and go to the pattern number (filed numerically) and go from there. My OLD system had a separate notebook with pictures of the pattern. That's entirely too much for me! All I need to know is whether or not there is a blouse pattern available in my size - and then go check it out!



Also finished my fall cleaning of the Dining Room (inside of windows, and sills, dusting and dustmopping and cleaning floor) and my Zone work for my room!

Had green bean soup (think veggie soup - with beef broth - and only green beans instead of carrots and potatoes) - quite good!

Now on to sewing!

Today - I want to work on:
1) Quilting Sampler
2) Baby Quilt 2 - not a lot to finish up there - just want to get that done
3) Hurricane Sandy
4) the Hexie centerpiece for Lynn's table
5) IF I have time (doubtful) I'd like to work on the Charm Around Sampler

Pix later of each of these projects!

Followers